Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
April 20, 2024, 03:48:50 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 2 [3] 4 5 ... 15   Go Down
  Print  
Author Topic: Punggol residents to have new Community Club  (Read 179534 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #8 on: June 18, 2010, 03:43:39 AM »

One month later, lets review the progress at site.

The piling machine is still there, pile pressing is still in progress. Workers were at site digging trenches to locate finished pile heads. Once trenches are open up to the size required, the next stage of the construction will proceed.

Fabrication of beam reinforcements, formwork erection and concreting should follow.



* IMGP2562.JPG (312.77 KB, 800x600 - viewed 1436 times.)

* IMGP2569.JPG (337.53 KB, 800x600 - viewed 1469 times.)

* IMGP2561.JPG (301.69 KB, 800x600 - viewed 1436 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #9 on: July 17, 2010, 08:13:21 AM »

Piling work for the Community Club completed. Heavy piling machine had left the site a few days ago.

Excavators are digging trenches to locate the pile heads. Land surveying levelling machines, portable cutting and welding machines are at site.

At one location opposite the proposed entrance to the CC, workers are concreting the massive foundation and are in the process of completion. Next to it excavators are busy working on the ground.

In another month's time, from the general progress at site, most of the foundations should be ready and fabrication of the steel work for the columns should commence.



* IMGP3080.JPG (310.16 KB, 800x600 - viewed 1435 times.)

* IMGP3069.JPG (319.94 KB, 800x600 - viewed 1443 times.)

* IMGP3064.JPG (315.01 KB, 800x600 - viewed 1417 times.)
Logged
tom

Offline Offline





Ignore
« Reply #10 on: August 25, 2010, 10:34:19 AM »

Punggol Community Club is surrounded and dwarf by Punggol Plaza on the left, Punggol Nautilus behind and on the right. So whenever a picture is taken from higher ground all surrounding buildings seems to crowd and make Punggol CC very small.

The construction of the Community Club is different from the pre-fab structures of our BTO flats all around Punggol.

Pictures show the wall of the first structure that went up were constructed with red-bricks, cement and mortar. Steel reinforcements for the beams of the adjacent structure were fabricated on site. Once ready, BRC's for the floor will be laid and concreted after inspection. The contractors used the traditional method because each and every floor may be designed differently.

Not many workers are seen working daily, but the progress for the past six weeks seems good.



* IMGP3789.JPG (203.24 KB, 640x480 - viewed 1404 times.)

* IMGP3796.JPG (233.98 KB, 640x480 - viewed 1410 times.)
Logged
tom

Offline Offline





Ignore
« Reply #11 on: August 25, 2010, 10:51:11 AM »

Look at the massive temporary steel tubing supports below floor. These are used to support the weight of the concrete floor slabs during and after concreting. Concrete takes about 28 days to set and be hardened before the temporary structures can be dismantle.



* IMGP3813.JPG (227.8 KB, 640x480 - viewed 1411 times.)
Logged
Pages: 1 2 [3] 4 5 ... 15   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.086 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server