Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
March 19, 2024, 05:38:37 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: [1] 2 3 ... 27   Go Down
  Print  
Author Topic: Punggol Waves ( newly launched April 2010 )  (Read 135426 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« on: May 25, 2010, 10:22:28 PM »

Punggol Waves is located South of the Punggol Town Centre ( punggol Central ) next to Punggol Ripples.

It is also next to the Tampines Expressway which can be quite noisy especially during the night.

Nearby is a Secondary School under construction.

This project consists of the following :

1. Three room apartments 105 units cost between $150,000 to $186,000 each
2. Four room apartments 259 units cost between $243,000 to $301,000 each
3. Five room apartments 209 units cost between $330,000 to $385,000 each



* IMGP2080.JPG (244.02 KB, 800x600 - viewed 11544 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #1 on: March 05, 2011, 05:28:04 PM »

Recently, we saw activities going on at the building site of Punggol Waves. As usual, similar to other nearby construction sites, initially site offices were erected.

Soon tractors, cranes, excavators, drilling rigs with workers kept moving in. Drilling rigs were stationed and drilling for cast-insitu piles starts.

Next, trucks kept moving in and out of the site carting away dug-up soil. Piles were concreted and load testing performed. It continues for at least 60 days before the next stage of work commences.......

Take a look at this bird-eye view picture.




* IMGP7853.JPG (206.67 KB, 640x480 - viewed 10932 times.)
Logged
tom

Offline Offline





Ignore
« Reply #2 on: March 05, 2011, 05:45:08 PM »

Punggol Waves with tpe expressways right in front..... is it going to be too noisy at night ?

This picture was taken at around noon, although not many vehicles were spotted but the humming sound of traffic kept druming into my ears. Sounds quite bad.......




* IMGP7810.JPG (223.15 KB, 640x480 - viewed 11145 times.)
Logged
tom

Offline Offline





Ignore
« Reply #3 on: March 05, 2011, 06:00:17 PM »

Picture shows drilling rig at work together with excavator and crane. Not far away, load testing of completed piles are underway.

Punggol Walk is at the moment under going extensions and construction starting from Punggol Field.



* IMGP7813.JPG (239.23 KB, 640x480 - viewed 10768 times.)
Logged
Pages: [1] 2 3 ... 27   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.288 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server