Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
March 18, 2018, 10:12:58 AM *
Welcome, Guest. Please login or register.
Did you miss your activation email?

Login with username, password and session length
News: Terms of Service
   Home   Photos Help Calendar Login Register  

Pages: 1 [2] 3 4 ... 15   Go Down
Author Topic: Punggol residents to have new Community Club  (Read 98259 times)
0 Members and 1 Guest are viewing this topic.

Offline Offline

« Reply #4 on: April 22, 2010, 05:07:06 PM »

Almost 27 days later, the progress made at site is not bad. Soil investigation completed. The equipment left the construction site. Pile loading and design should have been work out.

Heavy lifting cranes moved in on stand by. Pile driving machinery are already there. Workers are seen preparing and stationing pile driver to location. Piling work should start shortly.

Here are the pictures :

* IMGP1241-2.png (609.31 KB, 728x546 - viewed 678 times.)

* IMGP1242-2.png (672.93 KB, 725x543 - viewed 724 times.)

* IMGP1244-2.png (610.94 KB, 725x543 - viewed 727 times.)
« Last Edit: October 22, 2011, 04:31:53 AM by Admin, Reason: resize photos » Logged



Offline Offline

« Reply #5 on: May 10, 2010, 10:47:58 PM »

A picture of the construction site at our Punggol 21 plus Community Club. So far not much progress. The picture behind is the Nautilus @ Punggol.

* IMGP1690.JPG (294.35 KB, 800x600 - viewed 1075 times.)

Offline Offline

« Reply #6 on: May 12, 2010, 09:41:55 PM »

Most of the time residents in Punggol had been complaining about noise polution from fighter aircrafts flying overhead.

Did anyone notice although Nautilus Building site ( next to Punggol Plaza ) and the Punggol 21 Plus Community Club Building are in progress, very little noise is generated ?

Maybe we should thank the thoughtfulness of the Architects, Contractors, HDB and whoever is involved to keep noise level down by using up-to-date Piling Equipments.

For example, Nautilus is using " Cast-in-Place piling systems " instead of the precast / Piling Rigs.
Punggol 21 plus Community Club Building is using the " Pile Pressing Machine "

Offline Offline

« Reply #7 on: May 13, 2010, 04:14:31 PM »

Pile pressing in progress. The lifting of the pile for anchoring to Pile Pressing Machine was done by the crawler crane. Once in place and alignment made, pressing will begin.



* IMGP1839.JPG (301.92 KB, 800x600 - viewed 1074 times.)
Pages: 1 [2] 3 4 ... 15   Go Up
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.136 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server