 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
May 05, 2024, 05:23:54 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 6 7 [8] 9 10 ... 29   Go Down
  Print  
Author Topic: Work in progress ( HDB Waterway Terraces @ Punggol )  (Read 224749 times)
0 Members and 3 Guests are viewing this topic.
tom

Offline Offline





Ignore
« Reply #28 on: April 05, 2012, 05:37:11 AM »

Today we saw the complete transformation of reinforced concrete piles to foundations with reinforced concrete columns gradually surfaced forming the first level.

The site is at the corner of Punggol Way and the Waterway @ Punggol. This is where Block 308C is located. Some of the columns are still with ready-made formworks, others had their formworks removed.

First a bird-eye view of the whole Site stretching from Punggol Emerald to Atreasuretrove on the right. Next from Waterway 1 to Waterway 2 right up to the Johore Straits.






* P4041017.JPG (290.43 KB, 640x480 - viewed 1562 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #29 on: April 05, 2012, 05:55:01 AM »

Refer to the above posting and take a look at detail " A ".

Detail " A " shows an enlarge picture of part of Block 308 C. Notice a workman is working on the datumn line for the first level. Soon workers should be working on it's floor level, putting up supports and  reinforcements for the first / second level.



* P4041008.JPG (350.26 KB, 640x480 - viewed 1473 times.)
Logged
tom

Offline Offline





Ignore
« Reply #30 on: April 05, 2012, 07:11:17 AM »

Next look at enlarged picture detail " B " with an erected overhead tower crane installed. Also look at the stacks of brcs reforcement nettings meant for the floor slabs.

Ready made formworks for the Block was also stacked nearby.



* P4041007.JPG (377.46 KB, 640x480 - viewed 1405 times.)
Logged
tom

Offline Offline





Ignore
« Reply #31 on: April 05, 2012, 11:11:35 AM »

We now take a general view of the whole Waterway 1 Building site with two shots, in between Punggol Walk at one end and Punggol Way at the other.

First Picture : As the picture shows, generally, excavators are digging trenches to recover more concrete piles. Altogether there are six overhead tower cranes. In some areas, foundations had been built with the ground level concreted.

In a few weeks time, as work progresses, one to two levels up, we should be able to capture clearer close-ups from long distances.



* P4041013.JPG (364.47 KB, 640x480 - viewed 1457 times.)
Logged
Pages: 1 ... 6 7 [8] 9 10 ... 29   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.217 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server