Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
October 09, 2024, 04:04:37 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 [2] 3 4 ... 32   Go Down
  Print  
Author Topic: Pictures of work in progress ( Nautilus @ Punggol )  (Read 157245 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #4 on: June 18, 2010, 05:18:40 AM »

As for 168D, concreting of the main load bearing RC column and walls are in progress. A hugh portion of them had been concreted. Towards the rear of the block, formworks for some columns and walls are still being carried out.

Before precast floor units can be lifted up and put in place, massive scaffolding metal tubes had to be erected to support it's weight. In another two weeks time, block 168D should catch up with 168C. 





* IMGP2563.JPG (333.54 KB, 800x600 - viewed 2286 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #5 on: July 13, 2010, 10:53:35 AM »

On 4th May 2010, the site at block 169B was a flat muddy plot, no activities, only with completed piling work. Today, after two months, the concrete conveyor truck is one stand-by to concrete the ground floor.

This morning, the site was buzzing with an inspection team, consisting of Structural Engineers from HDB, site Engineers, contractors, foreman and workers.

Structural Engineer's job is to inspect structural beams, BRC's for floor slabs to make sure  they are fabricated in accordance to drawings and specifications.

Building contractors and workers are on stand-by to correct all faults as pointed out by the inspection team before concreting are allowed.

From observation, the constructional method used defers from that of Punggol Arcadia.



* IMGP3096.JPG (325.02 KB, 800x600 - viewed 2127 times.)
Logged
tom

Offline Offline





Ignore
« Reply #6 on: July 13, 2010, 11:06:39 AM »

Another view of the structural inspection work in progress :



* IMGP3095.JPG (299.29 KB, 800x600 - viewed 2101 times.)
Logged
tom

Offline Offline





Ignore
« Reply #7 on: July 13, 2010, 11:34:34 AM »

Block 168C ( next to Punggol Plaza )

On 18th June 2010 workers are preparing formworks for the floor slabs to first level.

Today, three weeks later, they are on the second level working on the formwork for BRC's and other steel reinforcements. Some pre-fabricated units are on site, ready to be hoisted up for installation once the floor is ready.





* IMGP3060.JPG (303.7 KB, 800x600 - viewed 2243 times.)
Logged
Pages: 1 [2] 3 4 ... 32   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.071 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server