Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
October 09, 2024, 04:27:06 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 8 9 [10] 11 12 ... 34   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO Punggol Sails )  (Read 190034 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #36 on: May 25, 2011, 10:49:46 AM »

For Block 208A photo showed construction / fabrication reached level 3. Workers are building up perimeter fencing / railings as a protection as work should be on the 4th level soon.

Around the block, quite a lot of prefabricated building components for the next level are on standby.



* IMGP0002.JPG (198.65 KB, 640x480 - viewed 1950 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #37 on: May 25, 2011, 11:19:40 AM »

A general view of Block 208B to be followed by a close-up of the constructional progress of pre-fabrication and installation.

Block 208B as of today completes fabrication and installation of prefab panels reaching level 3 with floor slab concreted. A few columns for 4th level, store / bomb shelter was also lifted up and put in place.



* IMGP9872.JPG (227.19 KB, 640x480 - viewed 1848 times.)

* IMGP9875.JPG (217.67 KB, 640x480 - viewed 1843 times.)
Logged
tom

Offline Offline





Ignore
« Reply #38 on: May 26, 2011, 12:32:19 AM »

General bird-eye view of Punggol Sails ( Block 207B ) with the rest of other Blocks at Punggol Sails construction site.

The next photo shows a close-up view of Block 207B showing construction updates.

Completed level 2, proceeding to level 3 with some columns and store / bomb shelter installed. According to site plan Block 207B links to Block 207A forms an " U " shape. The combination is close / next to the adjacent Punggol Crest.





* IMGP9889.JPG (222.29 KB, 640x480 - viewed 1769 times.)

* IMGP9954.JPG (220.1 KB, 640x480 - viewed 1844 times.)
Logged
tom

Offline Offline





Ignore
« Reply #39 on: May 26, 2011, 02:11:54 AM »

General bird-eye view of Block 207A includes Blocks in progress of Punggol Sails buiding site.

Next photo shows close-up view of constructional progress of 207A.

Compared to other Blocks, Block 207A was the first Block to be erected. Presently, completed four floors with safety railing erected along it's perimeter. A few prefab columns plus a gable wall were also hoisted, installed and strutted with scaffold steel pole.



* IMGP9890.JPG (228 KB, 640x480 - viewed 1745 times.)

* IMGP9972.JPG (192.68 KB, 640x480 - viewed 1729 times.)
Logged
Pages: 1 ... 8 9 [10] 11 12 ... 34   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.145 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server