Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
May 20, 2024, 09:45:37 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 10 11 [12] 13 14 ... 27   Go Down
  Print  
Author Topic: Punggol Waves ( newly launched April 2010 )  (Read 137314 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #44 on: December 06, 2011, 11:24:40 AM »

Reports up to today since 1 November. One floor, level 3 fully completed installation of prefab panels.

The 4th floor floor slab had been concreted, fixing of prefab components are in progress. Quite a number of trailers loaded with window casement panels are on site. In the next few days work should be concentrated at Block 212A.



* PC050767.JPG (353.68 KB, 640x480 - viewed 635 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #45 on: December 07, 2011, 10:16:34 AM »

Block 212 B with two levels fully completed with installation of prefab units. The third floor with floor slabs concreted. Most of the prefab units are in placed except for one or two stores / bomb shelters which probably had just been delivered to site.



* PC050784.JPG (335.78 KB, 640x480 - viewed 601 times.)
Logged
tom

Offline Offline





Ignore
« Reply #46 on: December 07, 2011, 10:43:37 AM »

The first Block of 213 B now stands 5 levels tall.

On 1st November it only completed up to level 3 with the 4th floor floor slabs concreted.

Five weeks later, it almost completed another two floors. There are still quite a number of prefab panels and stores need to be hauleed up for fixing.



* PC050756.JPG (338.75 KB, 640x480 - viewed 623 times.)
Logged
tom

Offline Offline





Ignore
« Reply #47 on: December 07, 2011, 10:59:56 AM »

Block 213 C with the second level fully installed with prefab units.

Third floor floor slabs concreted. Most of the front panels with casement windows put up. Workers are still very busy working on this block when  pictures were taken. Loads of panels for 213 C were stored nearby.



* PC050782.JPG (329.26 KB, 640x480 - viewed 626 times.)
Logged
Pages: 1 ... 10 11 [12] 13 14 ... 27   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.083 seconds with 19 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server