Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
October 09, 2024, 03:28:18 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 [2] 3 4 ... 24   Go Down
  Print  
Author Topic: Punggol Spectra ( work in progress )  (Read 146472 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #4 on: June 22, 2010, 11:05:47 AM »

All trucks  leaving the construction site has to go through a pool of water to automatically clean the tyres to remove mud. As it reaches the exit, the truck was throughly splashed before allowing to exit.



* IMGP2616.JPG (311.18 KB, 800x600 - viewed 3788 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #5 on: July 31, 2010, 06:08:48 AM »

One month ago, excavators were busy digging the ground at three locations, temporarily we called them " excavations 3, 2 and 1.

Lets take a look at the amount of work done in stages, for the past 30 days.

1. As soon as piling work completes, excavators were at site, digging trenches to recover piling heads.
2. Next, extra length of concrete piles were trimmed by compressed air-drills.
3. Reinforcement steel bars were cut to required height.





* IMGP3266.JPG (248.69 KB, 640x480 - viewed 3733 times.)

* IMGP3283.JPG (215.43 KB, 640x480 - viewed 3658 times.)
Logged
tom

Offline Offline





Ignore
« Reply #6 on: July 31, 2010, 06:31:26 AM »

4. Extend new steel reinforcements for foundation work.

5. Erect formworks ready for concreting.



* IMGP3268.JPG (251.27 KB, 640x480 - viewed 3613 times.)
Logged
tom

Offline Offline





Ignore
« Reply #7 on: July 31, 2010, 06:48:02 AM »

6. Surveyors with " Theolodite " levelling equipment determines the level of concreting to be done in accordance with engineering / structural drawings and specifications.

7. Concreting will be done by concrete mixers with conveyor belt truck.



* IMGP3294.JPG (260.6 KB, 640x480 - viewed 3698 times.)
Logged
Pages: 1 [2] 3 4 ... 24   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.136 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server