Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
March 23, 2018, 03:17:25 PM *
Welcome, Guest. Please login or register.
Did you miss your activation email?

Login with username, password and session length
News: Terms of Service
   Home   Photos Help Calendar Login Register  

Pages: 1 [2] 3 4 ... 11   Go Down
Author Topic: Pictures of work-in-progress ( HDB BTO Punggol Arcadia )  (Read 64738 times)
0 Members and 1 Guest are viewing this topic.

Offline Offline

« Reply #4 on: May 10, 2010, 10:18:54 PM »

A school under construction just across the road facing Punggol Arcadia. The far end of the picture shows Sengkang housing estates.

Take a look at the lone LRT line going from Punggol Central towards Sengkang. It seems to run parallel to Punggol Way.

* IMGP1748.JPG (261.47 KB, 800x600 - viewed 1959 times.)
« Last Edit: May 10, 2010, 10:27:50 PM by tom » Logged



Offline Offline

« Reply #5 on: June 09, 2010, 09:40:19 PM »

Blocks facing Punggol Field as of begining of May are at second / third levels. The fourth floor floor formwork, installation of BRC wiremesh reinforcements for concreting are not even started.

As of today 9th June 2010, five weeks later, workers are concreting the fifth floor floor slabs with piped concrete by conveyor belt system. Concrete mixers trucks are moving in and out of the worksite two to three loads at a time.

* IMGP2390.JPG (285.75 KB, 800x600 - viewed 1927 times.)

Offline Offline

« Reply #6 on: June 09, 2010, 09:44:37 PM »

Concreting of floor slabs in progress.

* IMGP2410.JPG (320.58 KB, 800x600 - viewed 1870 times.)

Offline Offline

« Reply #7 on: June 09, 2010, 09:57:27 PM »

Let's take a look at a side elevation view from open field next to Punggol Road.

Notice all the gable walls of the building are with cast-in-situ concrete. ( not pre-fabricated ) The floor slabs are also cast on site, after the storerooms and other structures are in place.

Building levels completed are 4th, 5th and 6th levels towards the end.

* IMGP2352.JPG (238.97 KB, 800x600 - viewed 1865 times.)
Pages: 1 [2] 3 4 ... 11   Go Up
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.145 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server