Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
November 21, 2019, 05:22:37 PM *
Welcome, Guest. Please login or register.
Did you miss your activation email?

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 2 3 [4] 5 6 ... 11   Go Down
  Print  
Author Topic: Pictures of work-in-progress ( HDB BTO Punggol Arcadia )  (Read 75877 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #12 on: August 08, 2010, 12:09:15 AM »

Punggol Arcadia comprises 7 blocks of 16-storey residential HDB flats. ( total 750 units ). It has a basement carpark, landscape deck, communal facilities and Precinct Pavilion.

On the average between one and a half to two storeys were erected monthly. Those blocks facing Punggol Central are in an advance stage of completion, almost reaching the eleventh to twelve floor. There are four or five more floors to go. Base on the present performance, it will take another two to three months to reach the roof top.



* IMGP3492.JPG (184.54 KB, 640x480 - viewed 1965 times.)

* IMGP3493.JPG (189.09 KB, 640x480 - viewed 2021 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #13 on: August 08, 2010, 12:26:07 AM »

Looks like Punggol Arcadia is at the moment doing up a mock-up unit.

It involves the following :

1. To paint a sample unit for the Designers / Architects to choose a colour scheme for the entire project.
2. Install the aluminium windows with glass panels.
3. Install the aluminium sliding glass door for the living room.
4. The hand-railings for the balcony.
5. Any other fixtures as per request.



* IMGP3479.JPG (170.45 KB, 640x480 - viewed 1992 times.)

* IMGP3480.JPG (146.13 KB, 640x480 - viewed 2096 times.)
Logged
tom

Offline Offline





Ignore
« Reply #14 on: August 08, 2010, 11:05:53 AM »

How is it possible to achieve completion of one and a half to two storeys within a short span of a month.

1. Prefabrication construction methods.
2. Identical floor design from second storeys up.
3. Use of overhead tower cranes for lifting of heavy materials.
4. Use of vertical elevators for moving workers and light equipments up the building. ( It can be erected and dismantle at ease.



* IMGP3402.JPG (239.11 KB, 640x480 - viewed 1843 times.)

* IMGP3486.JPG (164.67 KB, 640x480 - viewed 1840 times.)
Logged
tom

Offline Offline





Ignore
« Reply #15 on: August 08, 2010, 11:24:16 AM »

5. Innovation and clever techniques used by contractors. Today, the whole external working platform with guard rails, protective nettings together with heavy formworks can be lifted, bolted in place in less than an hour.

In the olden days, it may take several days and several workers to do the job.



* IMGP3441.JPG (174.32 KB, 640x480 - viewed 1434 times.)

* IMGP3450.JPG (149.8 KB, 640x480 - viewed 1338 times.)

* IMGP3451.JPG (162.15 KB, 640x480 - viewed 1320 times.)
Logged
Pages: 1 2 3 [4] 5 6 ... 11   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.139 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server