Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
March 28, 2024, 09:46:15 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 2 [3] 4 5   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO Punggol Spring )  (Read 62714 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #8 on: October 16, 2010, 10:56:56 AM »

Lets see what is happening on the roof top again. Water tank installation in progress. Water tank concrete housing structures, a few blocks completed, others in different stages of finishes.

The type and design of most of the water tanks  are almost identical, but the design of the roof top housing structures varies. Some looks simple, others are quite elaborate depending on the flat type.








* IMGP4635.JPG (113.5 KB, 640x480 - viewed 3822 times.)

* IMGP4647.JPG (185.81 KB, 640x480 - viewed 2561 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #9 on: October 16, 2010, 11:19:57 AM »

Pictures can only be taken from the outside, internally it's at the moment out of bound.

From the progress outside, it can be estimated that internal outfittings, such as pipes and toilet accessories, flooring and wall tiles, electrical fittings and sockets, switches, are also having a schedule. If the building construction is 80 % completed, internal finishes should be at least 50 to 60 % done.

At the facade, rough joints are sand down, touch up with cement grout, suspended gondolas at least 10 in numbers are working round the clock, preparing the surfaces for painting work.




* IMGP4641.JPG (194.95 KB, 640x480 - viewed 2421 times.)

* IMGP4644.JPG (147.04 KB, 640x480 - viewed 2300 times.)
Logged
tom

Offline Offline





Ignore
« Reply #10 on: October 16, 2010, 11:36:11 AM »

Some close-ups......



* IMGP4642.JPG (167.99 KB, 640x480 - viewed 2383 times.)

* IMGP4646.JPG (175.57 KB, 640x480 - viewed 2563 times.)
Logged
tom

Offline Offline





Ignore
« Reply #11 on: January 30, 2011, 07:58:37 AM »

Out of the five blocks of flats at Punggol Spring, at least two blocks are fully painted with casement windows / sliding doors fully glazed.

Cleaners are found at mid floors of the blocks, cleaning window glass panels probably in preparation for inspection before handling of completed blocks to HDB.

Looks like handling of blocks to HDB may be done  progressively .

Pictures were taken at almost 7.10 PM at the corner of Edgefield Plains and Punggol Drive.



* IMGP7220.JPG (179.01 KB, 640x480 - viewed 2277 times.)

* IMGP7225.JPG (148.97 KB, 640x480 - viewed 2180 times.)
Logged
Pages: 1 2 [3] 4 5   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.078 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server