Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
May 17, 2024, 02:50:32 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 7 8 [9] 10 11 ... 26   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO Punggol Crest )  (Read 144327 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #32 on: August 04, 2011, 12:23:23 AM »

In Plot section 2 :

Block 209A columns completed, carpenters almost completed the form work for the first floor level. Next Steel benders should be working on the BRC reinforcements for the R.C. floor.

The multi-storey- carpark ( mscp ) : ground floor beams and floor concreting done up. Steel benders are now working on the steel reinforcements for columns. In another two weeks time, first floor structures should be visible.......



* P8010053.JPG (135.14 KB, 640x480 - viewed 1583 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #33 on: August 04, 2011, 01:26:31 AM »

Block 209C :

The ground and first floor is cast-in-situ ( cast and working at site ). The second floor onwards are precast ( components prefab in the factory ) and install at site. The process is much faster.

So far, prefab panels for second floor had been completed. Workers are now preparing to work at level three.



* P8010055.JPG (131.95 KB, 640x480 - viewed 1477 times.)
Logged
tom

Offline Offline





Ignore
« Reply #34 on: August 04, 2011, 01:42:18 AM »

Other pictures of Block 209C showing additional details.......



* P8010056.JPG (125.68 KB, 640x480 - viewed 1450 times.)

* P8010057.JPG (109.34 KB, 640x480 - viewed 1439 times.)
Logged
tom

Offline Offline





Ignore
« Reply #35 on: August 31, 2011, 11:00:47 AM »

Take a look at Block 209C exactly 30 days later. Compared with the previous report, today Block 209C completes level four. Quite a lot of prefab panels are up and installed. Soon level 5 will be gradually taking shape.

Imagine the speed of prefab construction. In this typical project, two floors of prefab panels were put up within a period of only 30 days.

Of course it depends on the prefabrication yard and the construction teams working on the project. It's teamwork, co-operation, planning, supervision and proper management from bottom to the very top.



* P8310817.JPG (101.74 KB, 640x480 - viewed 1192 times.)
Logged
Pages: 1 ... 7 8 [9] 10 11 ... 26   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.143 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server