Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
April 30, 2024, 05:54:32 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 5 6 [7] 8 9 ... 26   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO Punggol Crest )  (Read 144059 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #24 on: July 11, 2011, 09:45:19 AM »

Lets take a look from a close-up view, section / plot by Plot from left to the right of the whole Building Site of Punggol Crest......

The first plot.....

On the whole the first plot shows construction is still at ground level. Concreting of foundations are still on going. A concrete pump is on stand by. It will probably take another month before the first level takes shape.



* IMGP1072.JPG (193.3 KB, 640x480 - viewed 1453 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #25 on: July 12, 2011, 11:36:16 PM »

Progress on Plot2 Punggol Crest......

The completion to date is almost the same as in Plot2......Concreted foundations, all in different stages of completion, but all still at ground level.

The work done is more even in Punggol Crest as shown in photos.....



* IMGP1071.JPG (195.08 KB, 640x480 - viewed 1364 times.)
Logged
tom

Offline Offline





Ignore
« Reply #26 on: July 13, 2011, 12:15:00 AM »

Plot 3 progress to date.....


Photo shows the multi-storey carpark building ( mscp ) foundations and footing beams, part of them completed. The other portion still under construction.

Block 209A, part of it with columns, formwork for columns, fabricated. Progress is at level 1. In another week or so, the progress pictures should be more defined......



* IMGP1069.JPG (200.09 KB, 640x480 - viewed 1353 times.)
Logged
tom

Offline Offline





Ignore
« Reply #27 on: July 13, 2011, 09:03:40 AM »

The fourth plot progress to date......

Block 209B with columns concreted. Floor slab concreted with heavy scaffold metal supports below.

Prefab columns for another level should commence soon and Block 209B will be expediated with prefab installation.

Part of Block 209C are on the second level with numerous columns, bomb shelters installed. So far this is the only Block having part of structure reaching level 2.





* IMGP1068.JPG (207.14 KB, 640x480 - viewed 1357 times.)
Logged
Pages: 1 ... 5 6 [7] 8 9 ... 26   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.139 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server