Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
April 23, 2024, 04:19:34 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 [2] 3 4 ... 65   Go Down
  Print  
Author Topic: All about Punggol Topaz : so far the largest Standard Contract in Punggol  (Read 295423 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #4 on: May 13, 2012, 01:16:38 AM »

Today at site, a 250 ton mobile crane is installing concrete counter weight blocks at the tail end of the boom. One by one was pick up and slotted in at the tail end compartment, totalling 4 numbers.

Once the tower crane was set up, installation of prefabricated conponents should be put up at a faster pace.



* P5121857.JPG (359.27 KB, 640x480 - viewed 3401 times.)

* P5121860.JPG (328.53 KB, 640x480 - viewed 3251 times.)

* P5121919.JPG (319.24 KB, 640x480 - viewed 3182 times.)

* P5121922.JPG (328.63 KB, 640x480 - viewed 3203 times.)
Logged


Advertisement



hyq

Offline Offline





Ignore
« Reply #5 on: August 13, 2012, 10:16:49 AM »

Took the pictures last week  thumbs up


* topaz01.jpg (437.2 KB, 1224x690 - viewed 2742 times.)

* topaz02.jpg (433.12 KB, 1224x690 - viewed 2703 times.)

* topaz03.jpg (426.55 KB, 1224x690 - viewed 2765 times.)
Logged
tom

Offline Offline





Ignore
« Reply #6 on: August 22, 2012, 11:36:35 AM »

Three months later, the pictures taken by ' hyq ' looks totally different. Thanks for your pictures, they look great !

Visited Punggol Sapphire this afternoon, took some pictures of Punggol Topaz and this is the latest development on site.

Picture shows Blk 258B, 258A and 258C at the centre. Blk 258A completed fabrication of level 2 proceeding to level 3. Blk 258B completed the first level, now almost completed installation of prefab units at level 2. For Blk 258C workers are at level 2 with couple of store / bomb shelters fixed up.



* P8220060.JPG (355.22 KB, 640x480 - viewed 2575 times.)

* P8220062.JPG (351.87 KB, 640x480 - viewed 3238 times.)

* P8220064.JPG (352.53 KB, 640x480 - viewed 2622 times.)

* P8220066.JPG (357.22 KB, 640x480 - viewed 2616 times.)
Logged
tom

Offline Offline





Ignore
« Reply #7 on: August 27, 2012, 09:05:04 AM »

Block 259B completed 4 floors of prefabricated panels. At the moment workers are working at 5th level. Several facade panels with windows are at site in front of Block 259B waiting to be lifted up or installation.

Block 259B is served by overhead tower crane 11. Block 258 A & B are served by tower crane 10.



* P8220068.JPG (356.41 KB, 640x480 - viewed 2422 times.)
Logged
Pages: 1 [2] 3 4 ... 65   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.152 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server