Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
May 01, 2024, 10:37:09 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 8 9 [10] 11 12 ... 24   Go Down
  Print  
Author Topic: Punggol Spectra ( work in progress )  (Read 143297 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #36 on: December 08, 2010, 10:20:30 AM »

Block 624B is only metres away from Horizon Primary School. Residents may not need to buy early morning wake up alarm bell. Morning assembly at the school will automatically wake us all up for office.

At the moment prefab / precast units were up till floor 7th.

8th floor store / bomb shelters, columns, facade window units were all up and installed. Very soon once the prefab floor units are hoisted up and concreted, it will go up to the 9th floor.







* IMGP6012.JPG (216.36 KB, 640x480 - viewed 857 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #37 on: December 08, 2010, 10:32:02 AM »

Take a look at how easily a complete facade window casement prefab unit is hoisted up by it's own block's overhead tower crane.

Each block is served with one overhead tower crane operating at different levels to prevent collision.



* IMGP5959.JPG (122.44 KB, 640x480 - viewed 777 times.)
Logged
tom

Offline Offline





Ignore
« Reply #38 on: December 08, 2010, 10:43:35 AM »

Picture showing the lifting up of a complete reinforced concrete (rc ) prefab floor slab.

The perimeter of the floor slabs are with protruding steel bars. The edges will then sit on top of rc beams where both the reinforcements of beams and floor slab joints will then be concreted.



* IMGP5954.JPG (123.82 KB, 640x480 - viewed 749 times.)
Logged
tom

Offline Offline





Ignore
« Reply #39 on: December 08, 2010, 11:06:08 AM »

All prefab units are manufactured elsewhere and transported to worksite by trailers.

Markings are on every unit with block numbers, unit numbers, floor level to ensure it is put up at the correct places.



* IMGP5852.JPG (197.87 KB, 640x480 - viewed 804 times.)
Logged
Pages: 1 ... 8 9 [10] 11 12 ... 24   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.121 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server