Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
May 03, 2024, 01:11:50 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 5 6 [7] 8 9 ... 58   Go Down
  Print  
Author Topic: Pictures of Work in progress ( Punggol Ripples )  (Read 195364 times)
0 Members and 2 Guests are viewing this topic.
tom

Offline Offline





Ignore
« Reply #24 on: July 08, 2011, 04:58:35 AM »

The whole constructional site with a little close-up shot.

 Notice the transformation ? On the whole at least another level had been added to the blocks.



* IMGP0923.JPG (177.37 KB, 640x480 - viewed 1337 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #25 on: July 08, 2011, 05:15:46 AM »

Block 211D, completed level 2 and partial 3. Some columns for the next level had been lifted, aligned and strutted in place.

Column installation is still in progress at the time of the photo session....



* IMGP0926.JPG (197.06 KB, 640x480 - viewed 1337 times.)
Logged
tom

Offline Offline





Ignore
« Reply #26 on: July 08, 2011, 06:18:30 AM »

Block 211A : Level 2 completed, panels with window casements installed.

Concrete floor slabs for the third level completed. Almost half the block installed with front panels and casement windows.

Column fabrication for third level done up, most extended to the fourth level.

Block 211B : Second floor completed with most fabricated components. Floor slab for the third level fully concreted. Workers concentrated on this Block preparing for extension to another level.

Block 211C : Second floor status similar to Block 211B. For the third level most bomb shelter / store installed. Column installation should be carried out in the next stage of construction.....



* IMGP0928.JPG (200.04 KB, 640x480 - viewed 1326 times.)
Logged
tom

Offline Offline





Ignore
« Reply #27 on: August 01, 2011, 09:24:28 AM »

Pictorial View of the project......



* P8010008.JPG (141.61 KB, 640x480 - viewed 1048 times.)
Logged
Pages: 1 ... 5 6 [7] 8 9 ... 58   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.245 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server