Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
April 28, 2024, 03:31:21 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 11 12 [13] 14 15 ... 26   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO Punggol Crest )  (Read 144029 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #48 on: November 04, 2011, 09:10:18 AM »

Prefab component installation reached level 9 with quite a number of columns fixed. At least 3 stores / bomb shelters had been installed.

No prefab components spotted at site. Most of the stores at site were steel reinforcements / brc's meant for the constrction of the multi-storey carpark.



* PB010787.JPG (95.58 KB, 640x480 - viewed 1392 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #49 on: November 04, 2011, 09:56:08 AM »

Installation of prefab components up to 5th floor. Most of the prefab panels for the 6th floor had been put up.

At 3.50 PM the portion marked with a green rectangle is empty. While taking pictures a front facade with casement windows was lifted up at 3.53 PM.

After some adjustments / alignments at 4.12 PM the facade was in placed. From lifting and installation it took exactly 19 minutes.

Here are the pictures in sequence.......



* PB010794.JPG (89.79 KB, 640x480 - viewed 1358 times.)

* PB010817.JPG (100.86 KB, 640x480 - viewed 1366 times.)

* PB010816.JPG (79.63 KB, 640x480 - viewed 1407 times.)

* PB010835.JPG (66.88 KB, 640x480 - viewed 1304 times.)
« Last Edit: November 04, 2011, 10:06:07 AM by tom » Logged
apple^^

Offline Offline





Ignore
« Reply #50 on: November 05, 2011, 04:21:57 AM »

 clapping  thank u Bro Tom  cheers
Logged
tom

Offline Offline





Ignore
« Reply #51 on: December 08, 2011, 07:10:52 AM »

The last progress report on the 1st November 2011 saw Block 210 C was up on the 8th floor without concreting the floor slabs.

Today a total of 2 floors were done up. 8th and 10th floor slabs were also concreted. A couple of stores / bomb shelters, columns were also installed. In fact on the ground, there are no more prefab units left for the day.



* PC050861.JPG (334.02 KB, 640x480 - viewed 919 times.)
Logged
Pages: 1 ... 11 12 [13] 14 15 ... 26   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.154 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server