Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
October 09, 2024, 02:49:10 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 [2] 3 4 ... 19   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO Punggol Breeze )  (Read 148208 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #4 on: May 13, 2010, 09:12:19 AM »

The first block along the LRT track ( Oasis station ) reached it's fourth level of construction. Most of the front facial slabs with window frames are up. In fact there are many more such slabs on the ground ready for installation.

The reinforced concrete floor slabs had been laid. Overhead tower cranes are busy lifting steel bars for steel-benders to fabricate columns.





* IMGP1788.JPG (297.96 KB, 800x600 - viewed 2689 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #5 on: May 13, 2010, 09:28:48 AM »

The second block along the track, workers are busy laying BRC's for floor slab. Most of the reinforcement work on beams are completed, some are receiving it's final touches.

Scaffolds along the perimeter of the entire floor area with green safety nets are install for the safety of workers.



* IMGP1790.JPG (330.76 KB, 800x600 - viewed 2564 times.)
Logged
tom

Offline Offline





Ignore
« Reply #6 on: May 13, 2010, 09:41:45 AM »

The third block reinforced concrete floor slabs done. Steel reinforcements for the entire block columns erected.

The next stage, steel prefabricated formworks will enclosed each column ready for concreting. Before enclosing, steel fabrication work had to be inspected by HDB's structural engineers conforming to drawings and specifications.

Once the building is on it's second level, work will be speeded up due to standard construction methods and fabrication.



* IMGP1792.JPG (338.91 KB, 800x600 - viewed 2499 times.)
Logged
tom

Offline Offline





Ignore
« Reply #7 on: May 13, 2010, 09:47:04 AM »

Work on the fourth block, the progress shows the reinforced concrete floor slabs done. Steel fabrication for columns are progressing.



* IMGP1793.JPG (316.74 KB, 800x600 - viewed 2501 times.)
Logged
Pages: 1 [2] 3 4 ... 19   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.07 seconds with 20 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server