Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
May 19, 2024, 12:26:30 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 7 8 [9] 10 11 ... 65   Go Down
  Print  
Author Topic: All about Punggol Topaz : so far the largest Standard Contract in Punggol  (Read 296881 times)
0 Members and 1 Guest are viewing this topic.
Tracia21

Offline Offline





Ignore
« Reply #32 on: January 14, 2013, 09:57:57 PM »

clapping yeahhhhh cant wait... though my block is abit slower but can see that the chances of getting keys next year !!! clapping

finally own home coming!!

 thumbs up thanks tom for updating us so frequent~~ Smiley
Logged


Advertisement



tutucake

Offline Offline





Ignore
« Reply #33 on: January 17, 2013, 07:20:15 AM »

Thank you Tom for the frequent updates!

base on ur experience with other punggol estates, how long more do you think Topaz residents need to wait to get the keys?
Logged
tom

Offline Offline





Ignore
« Reply #34 on: January 28, 2013, 08:20:30 AM »

Blocks 258B and 258A as at 31 December 2012 reached level 10th with both 11th level floor slabs concreted. At the same time a few prefab panels were put up with struts.

One month later 28 January 2013, two levels of prefab components were added. Now Block 258B and 258A stands tall at level 12th with floor slab 13th concreted.

Block 258C one level up with 10th floor level slabs concreted.









* P1261035.JPG (311.91 KB, 640x480 - viewed 1052 times.)
Logged
hanahana

Offline Offline





Ignore
« Reply #35 on: January 29, 2013, 04:57:17 AM »

Blocks 258B and 258A as at 31 December 2012 reached level 10th with both 11th level floor slabs concreted. At the same time a few prefab panels were put up with struts.

One month later 28 January 2013, two levels of prefab components were added. Now Block 258B and 258A stands tall at level 12th with floor slab 13th concreted.

Block 258C one level up with 10th floor level slabs concreted.









Thanks Tom!!
From your experience, when do you think we can get the keys?
Logged
Pages: 1 ... 7 8 [9] 10 11 ... 65   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.117 seconds with 19 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server