It was drizzling at Punggol Vista site. Not much
activity over there as it was dinner time I think.
Anyway the good news is the windows
at Block 601C have been installed. It is starting tolook
better. The repair work at the 16th floor is still ongoing.
So is the reconstruction of the slightly damaged
roof
They have started painting the darker
grey colors for the remaining part of the exterior walls.
They stopped painting when it rained.
The classic white, grey and brown colors of Vista
should stand out very well against the other flashy
blocks opposite
Once again, looking at the construction progress so
far, I am confident Kay Lim is on schedule to
hand over blocks 601C and D to HDB in early 3rd quarter.
And maybe beginning of 4th quarter for the other remaining
blocks.