Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
March 28, 2024, 03:00:06 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 [2] 3 4 ... 9   Go Down
  Print  
Author Topic: Waterway Banks , A Project Within Metres Of My Waterway @ Punggol  (Read 78608 times)
0 Members and 1 Guest are viewing this topic.
wiltanws

Offline Offline





Ignore
« Reply #4 on: October 09, 2012, 10:33:53 AM »

Status of Waterway Banks as at 8 Oct 2012.







http://www.facebook.com/WaterwayRidgesWaterwayBanks


* 65572_10151045787295686_1931642029_n.jpg (230.52 KB, 874x538 - viewed 2741 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #5 on: October 16, 2012, 10:33:37 AM »

Certain blocks at Waterway Banks are above ground level. Block 672D is at the moment at level 2. Block 673C completed level 1.

In the next couple of weeks time, these two Blocks should progress rapidly as pre-fabricated panels were delivered to site for installation.

Have a look at this video clip.............

Logged
tom

Offline Offline





Ignore
« Reply #6 on: December 18, 2012, 09:28:11 AM »

5 months later, lets see what's the latest.

Block 673C completed up to second level with casement window / front facade put up. On the third level prefabricated panels, store/bomb shelters, part gable walls and a high percentage of other prefabs fixed.

The block behind 673C is block 672D. At the moment completed level 4. Level 5 floor slabs concreted. Workers can be seen lifting up prefabs for installation progressively.



* PC150228.JPG (341.42 KB, 640x480 - viewed 2777 times.)
Logged
tom

Offline Offline





Ignore
« Reply #7 on: December 19, 2012, 08:36:32 AM »

Status of Block 673B, completed 2 levels with third floor concreted. Quite a number of prefab columns had been fixed.

As for Block 672C , it is at level 3. The fouth level part with casement window facades partially fixed, other prefab components in the process of being hauled up for installation.



* PC150229.JPG (326.6 KB, 640x480 - viewed 1997 times.)

* PC150230.JPG (341.48 KB, 640x480 - viewed 2668 times.)
Logged
Pages: 1 [2] 3 4 ... 9   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.145 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server