Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress  Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
May 22, 2012, 03:19:07 PM *
Welcome, Guest. Please login or register.
Did you miss your activation email?

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 13 14 [15] 16 17 18   Go Down
  Print  
Author Topic: Punggol Waves ( newly launched April 2010 )  (Read 22324 times)
0 Members and 2 Guests are viewing this topic.
tom

Offline Offline





Ignore
« Reply #56 on: February 12, 2012, 10:13:00 PM »

Not all floors are with precast slabs. Depending on design requirements, certain floors are with cast-on-site concrete.

Normally cast-on-site concrete are supplied by mobile concrete mixers. Pumping of concrete to floor levels that needs concreting are by mobile concrete pump trucks.

Concrete are measured in cubic metres. A normal floor the size as shown only took half a day to complete.



* P2080256.JPG (340.95 KB, 640x480 - viewed 517 times.)

* P2080269.JPG (316.57 KB, 640x480 - viewed 520 times.)

* P2080376.JPG (327.62 KB, 640x480 - viewed 529 times.)

* P2080380.JPG (316.67 KB, 640x480 - viewed 529 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #57 on: February 12, 2012, 10:39:54 PM »

Concrete that are pumped onto floor slabs need to be spread with a trowel. All airbubbles in the concrete need to be removed with a portable vibrator.

Before concreting, all conduit pipings below floor level has to be laid.



* P2080383.JPG (329.26 KB, 640x480 - viewed 520 times.)

* P2080385.JPG (316.68 KB, 640x480 - viewed 526 times.)

* P2080387.JPG (322.44 KB, 640x480 - viewed 525 times.)
Logged
tom

Offline Offline





Ignore
« Reply #58 on: February 13, 2012, 10:15:41 PM »

First a bird-eye view of the whole construction site taken from Sengkang High Rise. Block 213A is the last Block to be constructed, so naturally it may not be able to catch up with the rest of the Blocks in Waves.

Nonetheless, for the last several weeks, the speed of constructional progress for Block 213A is quite good.



* P2110398.JPG (301.1 KB, 640x480 - viewed 499 times.)
Logged
tom

Offline Offline





Ignore
« Reply #59 on: February 13, 2012, 10:36:20 PM »

Todate Block 213A is at level 5. All prefab components for this level had been installed.

Based on speed of construction at three floors within two months, by March Block 213A should climb another one and a half level.

At the moment the 6th level flooring had been done with at least 50% of prefab panels in placed.



* P2110400.JPG (357.49 KB, 640x480 - viewed 477 times.)
« Last Edit: February 13, 2012, 10:40:15 PM by tom » Logged
Pages: 1 ... 13 14 [15] 16 17 18   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.16 | SMF © 2006, Simple Machines Valid XHTML 1.0! Valid CSS!
Page created in 0.378 seconds with 19 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server