Dismantling process :
1. A hugh hydraulic system crane was tow to site, stationed and secured. Of course it had to be done by professionals / experts from the crane rental company. The crane driver, removal, co-odination within such a small space constraint needs special expertise. It's not easy. Everyone involved needs special engineering skill and expertise.
2. First, the weights, the crane booms, the driver's cabin had to be dismantled and carted away.
3. Followed by the tower cranes vertical steel structures. One section at a time.
4. It is then lowered onto waiting trailer on the ground and instantly carted away, probably to be reinstalled at another building site. ( after inspection )