Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
April 18, 2024, 02:00:50 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 2 [3] 4 5 ... 11   Go Down
  Print  
Author Topic: Pictures of work-in-progress ( HDB BTO Punggol Arcadia )  (Read 109022 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #8 on: June 09, 2010, 10:22:32 AM »

Next is the back elevation taken from an open field parallel to Punggol Central.

These blocks commenced constructions earlier, so most of them are at the 7th / 8th floors while others are at the 5th and 6th levels.

Punggol Arcadia consists of 7 blocks of 16 storey buildings. The carpark will be at the basement with landscape decking. An elaborate pavilion will be constructed at the entrance to the estate.



* IMGP2436.JPG (250 KB, 800x600 - viewed 2460 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #9 on: July 04, 2010, 08:22:57 AM »

Lets compare structural building progress, back elevation with back elevation.

On the average per month, we can see a complete floor being installed. The amount of work done includes the following back up facilities.

1. HDB factories design, made / prepared to order, prefabricated units accordine to projects and location. 
2. Transportation of fabricated housing units to site.
3. Handling and storage at building sites accordine to block numbers.
4. Hoisting by tower cranes up for installation.
5. Fixing, inspection, approval and final concreting.
All this work done, inspite of bad weather and ground conditions only took about 30 days. That's co-ordination.



* IMGP2905.JPG (272.38 KB, 800x600 - viewed 2380 times.)
Logged
tom

Offline Offline





Ignore
« Reply #10 on: July 04, 2010, 08:40:21 AM »

The first block at the corner of open field and Punggol Field completed fifth level and are now working on the sixth floor. Take note that all facade units come complete with plastic sheet covered aluminium frames.

For Punggol Arcadia the protective cover for aluminium frames are white in colour.





* IMGP2898.JPG (245.81 KB, 800x600 - viewed 2538 times.)
Logged
tom

Offline Offline





Ignore
« Reply #11 on: July 04, 2010, 08:57:27 AM »

Picture presentation of the second and third block.



* IMGP2899.JPG (250.99 KB, 800x600 - viewed 2342 times.)

* IMGP2900.JPG (264.41 KB, 800x600 - viewed 2329 times.)
Logged
Pages: 1 2 [3] 4 5 ... 11   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.148 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server