Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
October 13, 2024, 12:46:19 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 5 6 [7] 8 9 ... 32   Go Down
  Print  
Author Topic: Pictures of work in progress ( Nautilus @ Punggol )  (Read 157307 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #24 on: December 20, 2010, 10:00:57 AM »

Within a span of only 6 weeks, block 168C jumped from floor 12 to 16, thats an average achievement of one floor within approximately ten days. It's getting faster probably due to the speed of fabrication at the factory and good weather condition.

Similarily the speed is almost on par with blocks 168D and 169C. Block 168D at floor 15 and 169C at floor 13.



* IMGP6261.JPG (211.09 KB, 640x480 - viewed 1000 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #25 on: December 20, 2010, 10:29:12 AM »

Block 169B at 12th floor.

Block 169A at 11st floor.







* IMGP6270.JPG (210.44 KB, 640x480 - viewed 928 times.)
Logged
tom

Offline Offline





Ignore
« Reply #26 on: December 20, 2010, 10:58:36 AM »

Certain part of Block 170B is situated right in front of the building construction site's main entrance. Probably to expediate flow of trucks delivering materials to the site, it is built at a later stage. At the moment it is at the 4th level.

The connecting block is at level 9, workers are working on level 10.



* IMGP6297.JPG (185.82 KB, 640x480 - viewed 873 times.)
Logged
tom

Offline Offline





Ignore
« Reply #27 on: December 27, 2010, 10:35:34 AM »

For concreting on floors below 10, the concrete pump is used.

For concreting work above 10th floor, a specially design bucket is used. It is lifted up by the overhead tower crane and concreting is done manually.



* IMGP6293.JPG (143.37 KB, 640x480 - viewed 898 times.)
Logged
Pages: 1 ... 5 6 [7] 8 9 ... 32   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.075 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server