Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
October 09, 2024, 02:45:59 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 2 [3] 4 5 ... 11   Go Down
  Print  
Author Topic: Pictures of work in progress ( HDB BTO punggol residences )  (Read 107631 times)
0 Members and 1 Guest are viewing this topic.
tom

Offline Offline





Ignore
« Reply #8 on: November 26, 2010, 11:01:32 AM »

Look at the massive steel reinforcements used on the first and second floor level. These are all with formworks and cast at site concrete.

From third floor onwards, prefab method is employed. So progress will be speeded up.

Note also the used of  heavy metal temporary supports  below floor. It takes a lot of time......( traditional building construction )








* IMGP5523.JPG (184.68 KB, 640x480 - viewed 3077 times.)
Logged


Advertisement



Chrissybaby

Offline Offline





Ignore
« Reply #9 on: November 26, 2010, 08:50:49 PM »

Thanks for the updates!
Logged
tom

Offline Offline





Ignore
« Reply #10 on: January 05, 2011, 09:33:37 AM »

Front elevational view of blocks 271B and 271C taken from open field next to Punggol MRT station. Certain section of the block reached 5th storey. Others between level 2 to 3. As time goes, the level will be more distinctive.



* IMGP6979.JPG (195.47 KB, 640x480 - viewed 3050 times.)

* IMGP6977.JPG (214.85 KB, 640x480 - viewed 2923 times.)

* IMGP6976.JPG (206.99 KB, 640x480 - viewed 3011 times.)
Logged
tom

Offline Offline





Ignore
« Reply #11 on: March 02, 2011, 11:01:41 AM »

The average constructional progress at Punggol Residences is approximately 3 floors within a period of 2 months.
During our last report, Blocks 271B and 271C were on level 5 and 3 respectively.

Today part of Block 271B reached level 8 and the rest are all at level 5.

In comparison to other Punggol building projects, where most prefabricated units are either square or rectangle in shape, some blocks of Punggol Residences had protruding angular side window glass panels, which may take additional time to align.



* IMGP7761.JPG (176.85 KB, 640x480 - viewed 2877 times.)

* IMGP7762.JPG (169.85 KB, 640x480 - viewed 2861 times.)

* IMGP7763.JPG (172.32 KB, 640x480 - viewed 2902 times.)

* IMGP7764.JPG (176.87 KB, 640x480 - viewed 2817 times.)
Logged
Pages: 1 2 [3] 4 5 ... 11   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.1 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server