Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
April 19, 2024, 06:28:33 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 22 23 [24] 25 26 ... 143   Go Down
  Print  
Author Topic: First Executive Condo ( EC ) in Punggol Central.  (Read 702409 times)
0 Members and 2 Guests are viewing this topic.
tom

Offline Offline





Ignore
« Reply #92 on: May 17, 2011, 09:34:53 AM »

After only a period of about two weeks, look at the constructional progress at Block 35.

To have a clearer view, this picture was shot from Punggol Field instead of from Punggol Road which is block by the temporary site office.

The white line was drawn to highlight that the first level of Block 35 is taking shape.

1. Fabrication of high tensile steel cage for columns are in progress. Some are with formworks ready to be concreted.

2. Carpenters, scaffolders, steel benders are working hand in hand to prepare the first level beams, floor slabs for concreting work.

3. Take a careful look, metal tube scaffoldings are used under the floor slab to temporary support the floor load for concrete work.



* IMGP9624.JPG (229.34 KB, 640x480 - viewed 1780 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #93 on: May 17, 2011, 10:12:21 AM »

Close-up view of part of Block 35 showing columns fabrication with formwork ready for concreting upon inspection.

The temporary massive tubular steel scaffolds as support for fabrication of the first level floor slab.



* IMGP9654.JPG (218.64 KB, 640x480 - viewed 1826 times.)
Logged
tom

Offline Offline





Ignore
« Reply #94 on: May 17, 2011, 10:30:00 AM »

Collection of pictures of the condo building site for general viewing......



* IMGP9659.JPG (205.8 KB, 640x480 - viewed 1753 times.)

* IMGP9656.JPG (194.72 KB, 640x480 - viewed 1739 times.)

* IMGP9616.JPG (157.2 KB, 640x480 - viewed 1728 times.)
Logged
tom

Offline Offline





Ignore
« Reply #95 on: May 17, 2011, 11:16:14 AM »

Constructional progress pictures of Block 37

The drilling, the concreting of piles, the testing, the fabrication of steelwork, the formworks, the inspection, surveying etc......the sequence and constructional methods and procedures should be similar to other Blocks.





* IMGP9583.JPG (228.55 KB, 640x480 - viewed 1720 times.)

* IMGP9584.JPG (237.72 KB, 640x480 - viewed 1689 times.)

* IMGP9585.JPG (211.45 KB, 640x480 - viewed 1679 times.)

* IMGP9586.JPG (233.11 KB, 640x480 - viewed 1648 times.)
Logged
Pages: 1 ... 22 23 [24] 25 26 ... 143   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.139 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server