Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
April 19, 2024, 03:55:26 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 14 15 [16] 17 18 ... 143   Go Down
  Print  
Author Topic: First Executive Condo ( EC ) in Punggol Central.  (Read 702396 times)
0 Members and 3 Guests are viewing this topic.
tom

Offline Offline





Ignore
« Reply #60 on: March 22, 2011, 09:45:23 AM »

Picture shows a mobile concrete pump vehicle / truck in operation. Concrete is fed into the pump for concreting foundations from it's attached piping system.

When this picture was taken, the mobile concrete mixer parked behind the pump had left the site.



* IMGP8037.JPG (208.43 KB, 640x480 - viewed 1653 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #61 on: March 22, 2011, 10:13:23 AM »

The other end of the whole operation...........



* IMGP8022.JPG (239.49 KB, 640x480 - viewed 1665 times.)
Logged
tom

Offline Offline





Ignore
« Reply #62 on: April 02, 2011, 07:24:48 AM »

Two weeks later, lets see what progress had been made.

1. The whole floor area, previously with exposed BRC HT steel reinforcements had been concreted.

2. New plot dug out towards the left and top to expose reinforced concrete ( rc ) piles.

3. Drilling Rigs are still drilling, inserting steel cyclinders, steel cages and concreting.

4. Load testing on completed piles on new locations.



* IMGP8619.JPG (225.5 KB, 640x480 - viewed 1634 times.)
Logged
tom

Offline Offline





Ignore
« Reply #63 on: April 02, 2011, 07:43:46 AM »

Picture shows floor had been concreted.

The portion circled green is the footing / foundation for the installation of the overhead tower crane for lifting of materials for high rise construction. Each block will be equipped with one tower crane.



* IMGP8584.JPG (218.7 KB, 640x480 - viewed 1608 times.)
Logged
Pages: 1 ... 14 15 [16] 17 18 ... 143   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.152 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server