Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
March 28, 2024, 06:06:07 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 86 87 [88] 89 90 ... 143   Go Down
  Print  
Author Topic: First Executive Condo ( EC ) in Punggol Central.  (Read 699830 times)
0 Members and 3 Guests are viewing this topic.
tom

Offline Offline





Ignore
« Reply #348 on: April 07, 2012, 11:53:35 AM »

Another interesting pocket...........



* P4071186.JPG (293.38 KB, 640x480 - viewed 1784 times.)

* P4071188.JPG (302.86 KB, 640x480 - viewed 1799 times.)

* P4071189.JPG (301.79 KB, 640x480 - viewed 1834 times.)

* P4071190.JPG (316.75 KB, 640x480 - viewed 1894 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #349 on: April 09, 2012, 03:59:44 AM »

Technically, professionally, one panel at a time till the entire floor space are fully installed. Level check with theodolite, certified, the next stage continues.......


















* P4081248.JPG (317.14 KB, 640x480 - viewed 1549 times.)
« Last Edit: April 09, 2012, 04:01:54 AM by tom » Logged
tom

Offline Offline





Ignore
« Reply #350 on: April 09, 2012, 04:32:15 AM »

The next stage of construction is the laying of BRC nettings / reinforcements to the entire floor level. This includes laying of conduit pipes for cables / utilities ( shown in white ).

When completed, checked, inspected and certified by the relevant professionals, the entire floor will then be concreted.



* P4061073.JPG (345.6 KB, 640x480 - viewed 1597 times.)
Logged
tom

Offline Offline





Ignore
« Reply #351 on: April 09, 2012, 04:45:33 AM »

While taking pictures of floor construction details, managed to shoot a picture of the lifting and installation of a Gable End Wall for Block 37 Tower 10. How long does it take for the whole process ?

A mere 20 minutes, everything seems to be so smooth, probably due to a repetition of work sequence, team work and supervision.

 


* P4061096.JPG (278.95 KB, 640x480 - viewed 1550 times.)

* P4061098.JPG (295.13 KB, 640x480 - viewed 1573 times.)

* P4061108.JPG (268.97 KB, 640x480 - viewed 1548 times.)

* P4061127.JPG (262.69 KB, 640x480 - viewed 1557 times.)
Logged
Pages: 1 ... 86 87 [88] 89 90 ... 143   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.076 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server