Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
April 19, 2024, 03:45:08 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 52 53 [54] 55 56 ... 143   Go Down
  Print  
Author Topic: First Executive Condo ( EC ) in Punggol Central.  (Read 702395 times)
0 Members and 2 Guests are viewing this topic.
tom

Offline Offline





Ignore
« Reply #212 on: October 17, 2011, 12:30:32 PM »

Top elevation of Block 33.......

Details : units 17, 18, 19 and 20. Block 33 tower 5

            showing progress of brc reinforcements / formworks almost ready for concreting another level.





* PA170356.JPG (103.79 KB, 640x480 - viewed 1472 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #213 on: October 19, 2011, 10:48:30 AM »

Block 33 is almost double the length of Block 35. So it has to be taken in sections to show a clear continuity of the constructional detail.

The end section shows concreting in progress.....



* PA170357.JPG (106.28 KB, 640x480 - viewed 1234 times.)

* PA170358.JPG (96.47 KB, 640x480 - viewed 1269 times.)

* PA170362.JPG (95.23 KB, 640x480 - viewed 1240 times.)

* PA170382.JPG (111.52 KB, 640x480 - viewed 1250 times.)
Logged
tom

Offline Offline





Ignore
« Reply #214 on: October 19, 2011, 11:13:35 AM »

The following pictures show prefab panel struts, alignment and fixing.

Once the prefab components are lifted from the storage area by the overhead tower crane with the help of riggers, workers on the building floor will guide it to the correct position for erection.

Once position, aligned, checked by supervisor / surveyor,  the panel will then be strutted.



* PA170346.JPG (100.82 KB, 640x480 - viewed 1182 times.)

* PA170347.JPG (84.85 KB, 640x480 - viewed 1255 times.)

* PA170348.JPG (96.26 KB, 640x480 - viewed 1216 times.)
Logged
tom

Offline Offline





Ignore
« Reply #215 on: October 20, 2011, 09:59:59 AM »

So far this picture of Block 35 shows the front elevation / facade in a very clear perpective. The whole Building will even look more gorgeous if not obscure by the grey building sheet.

To capture the best shot for viewers with contrast in spite of the dirty grey is most satisfying.

The vertical elevator now in operation will expediate the movement of men and small tools up and down the building with ease and speed. Really undergraduates in Poly and the 'U'  in the Building trades, such as Building Construction, Quantities, Civil & structural Engineering, Building Management and Architecture should learn from this project.



* PA170387.JPG (95.46 KB, 640x480 - viewed 1125 times.)
Logged
Pages: 1 ... 52 53 [54] 55 56 ... 143   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.092 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server