Punggol.sg Punggol.sg
Punggol.sg Forum Terms of Service
Punggol Surroundings Punggol Topaz Historical Background Submitted Articles Articles - Child Care Centre Birds in My Backyard - Punggol 21
Notice: Crime Prevention Punggol Bus Guide Punggol LRT Guide BBQ Pit Booking
 Completed Project  Project In Progress
 Condominium  Others
Enrichment Programme Essential Telephone Numbers Infant/Child Care Services Kindergarten Primary/Secondary Schools Healthcare Establishments RCs, Fire Post Shopping Mall in/near Punggol Fashion and Accessories Food Country Clubs Camps Places Of Worship Others
March 29, 2024, 02:51:43 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Terms of Service
 
   Home   Photos Help Calendar Login Register  

Pages: 1 ... 28 29 [30] 31 32 ... 143   Go Down
  Print  
Author Topic: First Executive Condo ( EC ) in Punggol Central.  (Read 699927 times)
0 Members and 2 Guests are viewing this topic.
tom

Offline Offline





Ignore
« Reply #116 on: June 16, 2011, 12:09:03 PM »

Some close-ups for reference.......look at the left hand side where several steel cages / reforcements of cloumns are already fabricated.





* IMGP0433.JPG (197.88 KB, 640x480 - viewed 1297 times.)

* IMGP0444.JPG (211.71 KB, 640x480 - viewed 1300 times.)
Logged


Advertisement



tom

Offline Offline





Ignore
« Reply #117 on: June 16, 2011, 12:34:45 PM »

Installation of counter weights for overhead tower crane by a 250 tonner on wheels......
Look at the lifting of blocks and final slotting in into the tail end of the boom......



* IMGP0473.JPG (195.51 KB, 640x480 - viewed 1278 times.)

* IMGP0481.JPG (124.58 KB, 640x480 - viewed 1268 times.)

* IMGP0482.JPG (115.69 KB, 640x480 - viewed 1243 times.)

* IMGP0483.JPG (107.85 KB, 640x480 - viewed 1225 times.)
Logged
tom

Offline Offline





Ignore
« Reply #118 on: June 17, 2011, 08:58:40 AM »

Base on site plan, Block 33 is about one and a half times longer than Block 35. Both Blocks according to the building site were  being served by three overhead tower cranes ( tc1, tc2 and tc3 )

Looking at the number of columns already fabricated with steel reinforcements, reaching level one for Block 33 is only a matter of time. Base on the speed of construction of Block 35, Block 33 should be catching up probably in a week or two weeks time.

Hope this estimation will not be too far off.......



* IMGP0397.JPG (207.75 KB, 640x480 - viewed 1159 times.)
Logged
tom

Offline Offline





Ignore
« Reply #119 on: June 17, 2011, 09:20:28 AM »

Close up view of steel fabrication of columns ( B 33 ). High tensile steel rods are stored on the cemented floor, deliveries are still going on.

According to reports, most of the units had been sold. So probably the developers may want to complete the projects as early as possible.



* IMGP0420.JPG (203.37 KB, 640x480 - viewed 2229 times.)
Logged
Pages: 1 ... 28 29 [30] 31 32 ... 143   Go Up
  Print  
 
Jump to:  



Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2006, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!
Page created in 0.091 seconds with 21 queries.
About Punggol.sg Forum | Terms of Service
Hosted on Xssist™ Dedicated Server